Thursday, July 20, 2017

We had Dave D,  Bob D. and I  on site today.  The dry wall contractor was there and installed all the corner and window trim and the taping will start tomorrow or Sat.

Work progress:

The bath tub trap was installed and the last piece of dry wall was installed.

The last trim boards were install on the porch posts and the trim was painted.

The Aluminum trim was started on the porch but rain and heat stopped that about 2:00 pm.

The extra dry wall, the drywall lift and the extra insulation was returned  when the break was delivered.

Work to do:

Continue the aluminum trim on the porch and at the garage door.   ( I will work on this next week)

Korrect is scheduled for next Wed.

The side walk can be edged.

When the doors and trim are delivered the painting can begin.

Supplies:    We will need Ice on our next work day.

The dry wall tape needs to be delivered tomorrow.  ( Norm knows this)

Need paint and paint tools.

Jerry Shell

 