The weather today was quite nice a, and the four of us, volunteer Stefani, Bob, Ken and myself spent the day prepping the driveway for concrete. The driveway and walkway are ready for whenever Norm can make it happen. While that was the only thing we worked on, it was quite a challenge. The back pad is also ready to be poured. We placed gravel at the pad area for the AC unit.

The list from yesterday still needs to be done. When will the plumbers, electricians and HVAC guys return. When they do please ask them to take their leftover materials with them.

The dumpster is filling up.

I do not think that the small amount of topsoil in the back yard will be sufficient for the backfill required for final grade.