Wednesday, August 30, 2017

Good weather on site today, muddy ground though. Keith & Tim were there to guide our pour., I believe that we did about 13 cubic yards. The back pad, walk, driveway and the sidewalk and apron were all poured today. The bad news is that the concrete truck broke 3 more sections of walk. We did a sweep of the house and garage before leaving a little after 1:00. .

The range hood is still an issue; it appears that no ductwork to the outside was installed. The electrical switch in the laundry room has been relocated so the attic can be insulated anytime. There are probably some items in the garage that could be taken back to Habitat.

Let the sitework begin.