Attendees included Ken, Hank, Al, Rick I., Janet E., Karen, Tom,  and myself.

Gravel was shoveled on top of the foundation drainage pipe.  Sign posts were put in place for the Habitat signage, which is being completed.  Fourteen supports were put in place on the sill plate below where all windows will be.  Tent was installed next to the pod.

Now awaiting the inspection so that the floor decking can be installed.  Tim is to call me and let me know when we have been approved.  I will send a follow up email to all the people on this email with Tim’s instructions.   No need for anyone to go to the site tomorrow until we hear from Tim.

Work was cancelled at noon due to lack of things to do and the start of rain.

Bob Duplain