Thursday, August 26, 2021

The build is progressing well.

The shed has been moved and all of the materials from the house are in the shed or have been returned to habitat. The pump Jacks were also taken down and returned to Habitat.

The gas line was installed and connected to the house.

The drywall finishers are progressing well and i hope will be complete by Tuesday or perhaps Saturday.

This means a thorough cleaning and then painting of the walls can begin.

getting a final grading of the lot and the digging out for the walks and parking pads are tasks which can be done soon.

The front porch still needs the metal facing installed

Thanks for everyone’s help in getting the house to this point.

Ken